This Sandton office project called for the safe removal of facade branding from a high rise building, then replacement of the new sign set under strict access rules. Our crew planned every lift, tied off every tool, and kept the work moving without disturbing tenants below.

Sandton Office

Office Tower Sign Work in Sandton CBD

The client was a sign maker handling a corporate office rebrand on a multi storey building in Sandton CBD. The brief was straightforward on paper: take down the old fascia branding, store the reusable components safely, and install the new face and lettering in the same positions, with no damage to the cladding or glazing around it.

The building sat on a busy commercial street with limited loading space, tight visitor access, and strict property rules for contractors. We could not block entry points, could not leave materials on the pavement, and had to work around tenant movement during the day. That meant detailed planning before any tools went up. Our team did a site walk, checked the fixing points, measured clearances, and confirmed the access method for the upper level. The job took 2 weeks from first survey to final handover, with the main install completed in one planned working window and the rest used for prep, sign off, and close out.

Access Planning for a High Facade

Because the sign line sat above public level, access was the main issue. We arranged scaffold access and platform work where needed, then used lifting plans for the heavier sections. The building rules required a controlled work zone, tool lanyards, and signed permits before starting. Our safety officer checked the set up on site and kept the crew aligned with the building manager's instructions.

  • Working height: upper facade level on a high office building
  • Access method: scaffold access plus platform work for selected points
  • Controls: exclusion area, harnesses, tool tethering, and ground supervision
  • Timing: work scheduled outside peak tenant movement where possible

We also had to watch the wind. Even in the city centre, gusts can move lightweight panels and make lifting awkward. On the first morning the wind picked up just after setup so we paused, re checked the anchors, and resumed once it settled. That small delay kept the job safe and saved us from a messy reset later on.

Removal Without Damaging the Existing Face

The old signage had been fixed in more than one stage over time, so removal was not a simple unbolt and drop job. We isolated power, tested the lighting lines, and removed the face pieces in sequence so nothing twisted or cracked. The existing wall surface was in decent condition, but a few fasteners had seized from age and weather exposure, especially on the windward side.

We packed the removed sections for return to the sign maker and kept the reuseable fittings sorted separately. Where old sealant had hardened, our crew cleaned the surface back to a neat finish ready for the new installation. It sounds simple, but on a tall building that kind of tidy work matters. A rough removal can leave visible marks and slow the replacement stage down by a day or more.

Reinstalling the New Corporate Face

The replacement set included refreshed face panels, new graphics, and updated illumination points. We installed the new sections to the same alignment as the approved set out, then checked each fixing for even load and clean edge lines. The final result had to look sharp from street level and from the neighbouring office towers too.

  • New face panels set to existing grid lines
  • Lighting reconnected and tested after installation
  • Final alignment checked from ground level and upper viewing points
  • All loose fixings re torqued before sign off

Once the visual checks were done, we ran the lights after dark to confirm even spread and no dead spots. The building management team wanted a quick handover because the tenant had an important opening the next week. We completed the last inspection in time and issued the service notes for the sign maker, so they had a clean record of what was installed and where.

What We Supplied on This Project

This job needed more than a lift and a toolbox. We supplied a rigging crew, a supervisor, a safety officer, access planning, and the labour needed for both removal and reinstatement. Because the building was occupied, we also kept communication tight with the client liaison so everyone knew when the lift was live, when the zone was closed, and when the area could reopen.

Our role stayed within sign rigging only. We did not compete with the sign maker or take over their client relationship. They kept the design and supply side, while we handled the practical work at height. That division keeps everyone clear on scope and prevents delays when a project has multiple moving parts. It is how we like to work in Sandton, and across Gauteng generally.

  • Pre start site survey and access review
  • Lift planning and work sequence
  • Sign removal, storage, and reinstatement
  • Lighting access and testing
  • Final inspection and close out notes

Results, Lessons and What We Would Repeat

The result was a clean handover with the new facade branding in place, the old material removed, and no damage to the building fabric. The sign maker could move straight on to their next job, and the tenant had a neat exterior finish ahead of their launch. The property manager was happy because the work was finished within the agreed window and the site was left tidy. No extra callouts were needed after handover, which is always the best sign that the process was handled properly.

If we were doing the same job again, we would keep the same approach: early survey, clear lift plan, and a strict no shortcuts rule on access control. For taller Sandton buildings, that discipline matters more than speed. A calm crew, good gear, and a clear sequence will usually beat rushing every time.

This project is a good example of what our Johannesburg rigging crews do best: remove, service, and reinstall signage for sign makers who need a reliable partner on high buildings, tight sites, and time sensitive work.

Key facts

Project typeFacade branding removal and replacement
TownSandton, Johannesburg
Client typeCommercial sign maker
Duration2 weeks
Access methodScaffold access and platform work
ScopeRemoval, reinstatement, lighting access, final testing

What our Sign Rigging customers say

Verified Google reviews

Questions we get asked

Do you work directly for end clients or only for sign makers?

We work for sign makers and branding contractors who need a rigging crew. Our role is to install, remove, service, and access signs, while they keep the supply and client relationship.

Can you handle sign work on occupied office buildings?

Yes. We plan around tenant access, loading rules, and building permits. For occupied buildings in places like Sandton, that usually means tighter timing and a cleaner work zone.

What kind of projects do you take on in Gauteng?

We handle facade branding, sign removals, replacements, lighting access, maintenance visits, and emergency callouts across Johannesburg, Sandton, Midrand, the East Rand and nearby areas.